All Products
-
Structural Steel Fabrication
-
Heavy Steel Fabrication
-
Metal Steel Fabrication
-
Sheet Metal Fabrications
-
High Rise Steel Building Construction
-
Structural Steel Frame Construction
-
Steel Girder Bridge
-
Steel Truss Bridge
-
Pedestrian Overpass Bridge
-
Prefab Steel Frame
-
Light Steel Framing
-
Galvanized Steel Structure
-
Stainless Steel Fabrication
-
Steel Street Light Pole
-
Overhead Sign Structures
-
Steel Arch Bridges
-
Precast Girder Bridge
-
Donald McwayneGood team members always offer budget in time and answer questions with patience, great job!
-
Joseph AlexanderI am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
Contact Person :
Tomy.Gao
Phone Number :
+86-180 7273 5884
Whatsapp :
+8618072735884
Keywords [ steel construction building ] match 205 products.
Prefab Storage Shed Steel Structure Warehouse Construction Metal Building
Material Grade:: | Main Beam And Second Beam |
---|---|
Performance:: | Safety, Convenient, Install Easily Etc. |
Window: | Plastic Steel Window/Aluminum |
Tubular Pedestrian Steel Truss Bridge Design Footbridge Galvanized Pipe
Product Name:: | Steel Frame Trusses Bridge |
---|---|
Material:: | Q235 Q345B S235 S355 SS400 |
Color:: | Customer-made |
Plate Heavy Steel Fabrication Galvanized H Beam 100 150 200 250 300 400 AS/NZS Standard
Material: | Steel |
---|---|
Grade: | Q235B, Q345B,Q355B |
Type: | Heavy |
Galvanized Metal Deck Cell Closure Metal Floor Deck Steel Deck Sheets For Concrete Slab
Material: | Steel Deck |
---|---|
Type: | Comflor Alternative |
Width: | 600-1080mm |
Prefabricated Steel Structure Floor Deckings Composite Metal Galvalume 1.5mm
Material: | Steel Deck |
---|---|
Type: | Comflor Alternative |
Width: | 600-1080mm |
Robust Steel Tension Rod System 0.5-20mm For Structural Integrity
Lead Time: | 7-15 Days |
---|---|
Material: | Metal Steel |
Packaging: | Wooden Case Or As Requested |
Durable OEM / ODM Steel Tie Rod For Commercial Use
Lead Time: | 7-15 Days |
---|---|
Material: | Metal Steel |
Packaging: | Wooden Case Or As Requested |
Railway Steel I Girder Bridge Design Box Walkway Prefabricated
Application: | Steel Structure Bridge,warehouse,workshop |
---|---|
Warranty: | One Year For Main Parts |
After-sales Service Provided: | Engineers Available To Service Machinery Overseas,Field Installation,commissioning And Training,Online Support |
304 Plate Marine Stainless Steel Fabrication Process Building Drain Roof Rainfall Gutter
Product Name: | Stainless Steel Bending Processing Drain Roof Rainfall Gutter |
---|---|
MaterialGrade:: | SUS201/SUS304/SUS316 |
Surface Treatment:: | Polish |
Bridge And Viaduct Steel Tession Rod Systems Polishing High- Strength
Lead Time: | 7-15 Days |
---|---|
Material: | Metal Steel |
Packaging: | Wooden Case Or As Requested |