• Hangzhou FAMOUS Steel Engineering Company
    Donald Mcwayne
    Good team members always offer budget in time and answer questions with patience, great job!
  • Hangzhou FAMOUS Steel Engineering Company
    Joseph Alexander
    I am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
Contact Person : Tomy.Gao
Phone Number : +86-180 7273 5884
Whatsapp : +8618072735884

ASTM A588 Corten Steel Plate Truss Bridge – Prefabricated Weathering Pedestrian Crossing

Place of Origin China
Brand Name FASEC
Certification ISO 9001; CE (EN 1090); AWS D1.5 Compliant; AASHTO LRFD Compliant; EN 10204 3.1 MTCs
Model Number Steel Truss Bridge
Minimum Order Quantity 100 MT
Price USD 1,000-1,500/MT
Packaging Details Sea Freight (Container/Bulk Vessel)
Delivery Time 30-60 Days
Payment Terms L/C, D/A, D/P, T/T
Supply Ability 5,000-15,000 MT/Year
Product Details
Product Name High-Strength ASTM A588 Steel Plate Truss Bridge Main Material ASTM A588 Gr.A/B Weathering Steel
Truss Configuration Warren, Pratt, Howe, Through Truss, Deck Truss Connection ASTM F3125 Gr.A325 Type 3 Weathering Bolts
Surface Treatment Natural Weathering Patina / ISO 12944 C4-C5 Paint Quality Control 100% Factory Trial Assembly, NDT (UT/RT/MT)
Applications Highway Crossings, Rural Road Bridges, Industrial/mining Access Customization Customized To Customer Requirements
You can tick the products you need and communicate with us in the message board.
NDT Inspection
Leave a Message
Product Description

Most pedestrian crossings in parks, plants, and river corridors fail on maintenance rather than load. A painted steel bridge requires access, scaffolding, and a closure window every few years, with each repaint cycle costing more than the original coating.

This design removes that line item entirely. The truss is fabricated from ASTM A588 Corten steel plate, erected bare, and left to weather. The dense oxide layer (patina) that forms is the coating. It needs no paint, no recoating, and no maintenance shutdown.


Technical Specifications

 
 
Item Specification
Material ASTM A588 Gr.A / Gr.B Corten steel plate (Yield: 345 MPa min; Tensile: 485 MPa min). Supplied bare with Mill Test Certificate per heat.
Truss & Span Warren or Pratt welded plate truss (H-section or box-section chords). Single span: 15 m – 60 m. Clear walkway width: 1.5 m – 4 m.
Loading & Standard Pedestrian live load 5 kPa to AASHTO LRFD. Wind, seismic, and thermal movement verified for site. Deflection L/360 or stricter.
Deck & Railing Anti-slip grating, timber, or composite deck. Handrail 1.1–1.2 m, mid-rail, 100 mm max gap, toe board both sides.
Corrosion Strategy Bare weathering on exposed truss; galvanized or coated on splash zones, abutment steel, and buried members.
Delivery & Lead Time Steel pallet packing in 40HQ containers. 25–40 days after drawing approval.

How It Is Built (Workflow)

  1. Engineering & Shop Drawings: Span, width, load class, and railing height are fixed against the site survey, then converted into shop drawings with camber and connection details.

  2. Plate Fabrication: A588 plate is CNC cut, assembled in jigs, and welded to AWS D1.5. Welds are UT and MT inspected before the member leaves the bay.

  3. Trial Assembly: The full truss is match-marked and trial-assembled in the shop. Splice plates, bolt holes, and node geometry are proven before shipping.

  4. Site Erection: Modules arrive in container loads, are lifted into position, and bolted with A325 / A490 HSFG bolts. Typical single span erection takes hours, not weeks.


Scope of Supply

  • Match-marked truss segments, floor beams, and bracing members.

  • A325 / A490 bolt sets, nuts, washers, and splice plates per node.

  • Bearing pads, anchor assemblies, and drainage details.

  • Erection drawings, bolt schedule, and lifting point plan.

  • Mill test certificates, welding records, and inspection reports.

  • Optional: Decking, railing infill, and access gates.


Customization (Decisions You Control)

  • Finish: Bare weathering as standard; hot-dip galvanizing or a full paint system for aggressive/coastal sites.

  • Deck: Steel grating (drainage/slip resistance), timber (park aesthetics), or composite panel (low noise).

  • Railing: Standard mid-rail/toe board, or anti-climb mesh and lockable access gates.

  • Geometry: Span, walkway width, camber, and connection type set to your survey, not a catalogue.


Buyer FAQ

Q: Will the rust stain the abutments or the path below?
A: Run-off is controlled by detailing: drip edges, collection channels, and sealed end plates. Where a clean finish is required, we supply a clear sealer or paint the first 1 m of the truss.

Q: Can the bridge be painted later if the client changes their mind?
A: Yes. The patina must be removed by sweep blasting before any coating system is applied. We can supply the bridge with a holding primer if the client expects to paint within a year.

Q: Is bare weathering steel suitable for coastal sites?
A: Not for the splash zone. On coastal projects, the truss can be left bare above the splash line, while bearings, end posts, and all submerged/buried steel are galvanized or coated.

Q: What is the inspection and maintenance routine?
A: Annual visual inspection of members, bolts, and bearings. No recoating is scheduled; only bolt tension checks after the first year and drainage clearing.


About Our Company

Hangzhou FAMOUS Steel Engineering Co., Ltd. was established in 2002. We are an integrated structural steel manufacturer and global exporter, providing one-stop services from design and fabrication to surface treatment and export delivery.

Certified to ISO 9001 and CE (EN 1090), we operate complete in-house lines for Corten steel plate cutting, jig assembly, welding, and trial pre-assembly. Cutting, welding, blasting, trial assembly, and inspection are handled in-house, so the bridge stays under one roof from plate to shipment. Trial orders are welcome.

🌐 Websites: www.famoussteel.com | www.steelfabricat.com | www.structural-steelbuilding.com


Get Your Custom Bridge Solution

Send us your span, walkway width, design load, deck type, and site environment. We will return a preliminary truss layout, material proposal, and competitive price for your review.

Contact us today to start your next pedestrian bridge project.

ASTM A588 Corten Steel Plate Truss Bridge – Prefabricated Weathering Pedestrian Crossing

ASTM A588 Corten Steel Plate Truss Bridge – Prefabricated Weathering Pedestrian Crossing

ASTM A588 Corten Steel Plate Truss Bridge – Prefabricated Weathering Pedestrian Crossing