-
Structural Steel Fabrication
-
Heavy Steel Fabrication
-
Metal Steel Fabrication
-
Sheet Metal Fabrications
-
High Rise Steel Building Construction
-
Structural Steel Frame Construction
-
Steel Girder Bridge
-
Steel Truss Bridge
-
Pedestrian Overpass Bridge
-
Prefab Steel Frame
-
Light Steel Framing
-
Galvanized Steel Structure
-
Stainless Steel Fabrication
-
Steel Street Light Pole
-
Overhead Sign Structures
-
Steel Arch Bridges
-
Precast Girder Bridge
-
Donald McwayneGood team members always offer budget in time and answer questions with patience, great job!
-
Joseph AlexanderI am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
Long Span Steel Box Girder Footbridge Q460 Modular Structural Frame Fast Installation
Place of Origin | Zhejiang, China |
---|---|
Brand Name | FASEC |
Certification | ISO9001:2008, SGS, etc. |
Minimum Order Quantity | 1 pcs |
Price | USD1000~USD1200 per ton |
Packaging Details | Seaworthy packings into container or bulk vessel |
Delivery Time | Based on client's needs |
Payment Terms | L/C,T/T |
Supply Ability | 600,000 tons per Year |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xModel Number | CB100(321-Type)&HD200 | Surface Treatment | Painted Or Hot Dip.etc |
---|---|---|---|
Size | According To Client's Need | Installation | Lifted Into Place By Hand Without Crane, Easier Construction.etc |
Multi-use | Civil Engineering Construction Projects And To Provide Temporary Crossings For Foot & Vehicle Traffic. | Carry Capacity | Resist Strong Wind And Earthquake, Bears Heavy Snow.etc |
Grade | Q345B-Q460C | Color | Army Blue, Light Gray, Hot Galvanized Or Customized.etc |
High Light | Steels Box Girder Footbridges Q460,steels girders footbridges Q460,Steels Box Girder Footbridge Q460 |
Description:
Steel Box Girder Bridge refers to a beam bridge whose main beam is in the form of a thin-wall closed section. Long hollow trusses made of steel or concrete are usually used as beams. This makes the bridge light and sturdy. Bridges constructed using this method are called Steel Box Girder Bridge.
Steel box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport. Although normally the steel box girder bridge is a form of beam bridge, box girders may also be used on cable-stayed bridges and other forms.
Product Name | Steel box girder footbridge |
Width | 4.2meter |
Maximum span | 64meter single span |
Bridge deck | Steel composit panel |
Steel grade | Q460 |
Loading capacity | 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20 |
Corrosion | Hot dip galvanized |
Advantages | Price effective and technical full analysis and supports |
Construction
For steel box girders, the girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder.Either form of bridge may also be installed using the technique of incremental launching. Under this method, gantry cranes are often used to place new segments onto the completed portions of the bridge until the bridge superstructure is completed.
Features
Modular, pre-engineered, pre-fabricated bridge system
Standard interchangeable components
Highly adaptable, fully reusable and re-locatable
Transported in standard ISO containers
Quick and simple to build using labour
Fully galvanized for long life and minimum maintenance
3.048m module length
4.2m single lane
Proprietary steel decking systems to suit different loading requirements
Durbar finish or factory applied anti-skid surfacing
Full highway load carrying capability
Simple, cost effective foundations
Our companyOur experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.