-
Structural Steel Fabrication
-
Heavy Steel Fabrication
-
Metal Steel Fabrication
-
Sheet Metal Fabrications
-
High Rise Steel Building Construction
-
Structural Steel Frame Construction
-
Steel Girder Bridge
-
Steel Truss Bridge
-
Pedestrian Overpass Bridge
-
Prefab Steel Frame
-
Light Steel Framing
-
Galvanized Steel Structure
-
Stainless Steel Fabrication
-
Steel Street Light Pole
-
Overhead Sign Structures
-
Steel Arch Bridges
-
Precast Girder Bridge
-
Donald McwayneGood team members always offer budget in time and answer questions with patience, great job!
-
Joseph AlexanderI am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
Stud Cold Formed Light Gauge Steel House Construction Roof Trusses Framing
Place of Origin | Zhejiang,China |
---|---|
Brand Name | FASEC |
Certification | CE ,ISO,SGS |
Model Number | HZFC No.888 |
Minimum Order Quantity | 5 sets |
Price | USD 350-450 Per Square Meter |
Packaging Details | by seaworthy package |
Delivery Time | 8-15 working days |
Payment Terms | L/C, T/T |
Supply Ability | 100000 square meters per month |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xProduct Type | LGS Structure | Product Name | Hot Dip Galvanized Anti Slip Bar Steel Grating Weight,Galvanized Expanded Metal Lowes Weight Per Square Meter Steel Grating |
---|---|---|---|
Color | Silver,Customers Samples Color,black,White | Type | Press Welded Steel Grating |
Length | Customized-Made | Material | G550,Q235 |
Thickness | Customized | Usage | Light Steel Villa |
High Light | light gauge steel roof trusses,light gauge steel roof framing,light gauge steel stud framing |
Prefabricated Light Steel Structure Villa Luxury Light Steel Frame Villa House Easy And Quick To Install
Light steel pre-fabricated modular house is gaining popularity because they have lots of advantages over traditional houses like they are more resistant to natural calamities.
Light steel pre-fabricated modular house much more durable than conventional houses since they are constructed from steel which has the got the highest "strength to weight" ratio among other available construction materials.
Prefabricated Light steel structure villa luxury light steel frame villa house kit | ||
Main Steel Frame | Column&Beam | Q235,Q345 Welded H Section Steel |
Secondary Frame | Purlin | Q235 C&Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical&Horizontal Support | Q235 Angle Steel,Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS/Glass Fiber/Rockwool/PU Sandwich Panel or Steel Sheet |
Wall Panel | Sandwich Panel /Corrugated Steel Sheet | |
Accessories | Window | Aluminium Alloy/PVC/Sandwich Panel |
Door | Sliding Sandwich Panel door/ Rolling Metal door | |
Rain spout | PVC | |
Live load on roof | 50kg/Sqm(According to your request) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | UP to 50 years | |
Temperature | Suitable temperature:-50ºC~+50ºC | |
Options | Vast array of colors and textures availiable | |
Paint Options | Alkyd paiting,two primary painting,one finish painting(gray, red, blue,epoxy zinc etc) or Galvanized |
Prefab House Advantages:
- Clean worksite, no cement, no mold.
- Long working periods. Light steel don't effect at "Cold-Hot Weather Conditions".
- Silent worksites.
- Less working hours.
- Light Steel Structure, not harmful to the environment and its recyclable.
- Notably reducing loads.
- Healthy worksite for everyone.
- Easy and more defined, occupational safety and health administration.
- Light steel with suitable for shielding fully satisfies legal fire and thermal requirements.
- Easy erection doesn't need high technical skills, that's makes it easier to find staff. Less skilled staff means, save money.
- Easy to erection, restrain worker errors and incidental costs.
- Contractor can increase their turnover.
- Build more in a less time: On average it is guesstimate that light frame steel constructions take 40% less time to build. With our qualified erection teams, deliver more projects in less time, thus increasing your profit.
- Industrial standardization of the fabrication reduces the cost price & workshop pre-erection accelerates the duration of the worksite. Furthermore, steel is not sensitive to bad weather (no worksite stoppages)