-
Structural Steel Fabrication
-
Heavy Steel Fabrication
-
Metal Steel Fabrication
-
Sheet Metal Fabrications
-
High Rise Steel Building Construction
-
Structural Steel Frame Construction
-
Steel Girder Bridge
-
Steel Truss Bridge
-
Pedestrian Overpass Bridge
-
Prefab Steel Frame
-
Light Steel Framing
-
Galvanized Steel Structure
-
Stainless Steel Fabrication
-
Steel Street Light Pole
-
Overhead Sign Structures
-
Steel Arch Bridges
-
Precast Girder Bridge
-
Donald McwayneGood team members always offer budget in time and answer questions with patience, great job! -
Joseph AlexanderI am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
Long-Span Steel Bridge Deck System – Supports Heavy Loads with Minimal Structural Steel Consumption
| Place of Origin | China |
|---|---|
| Brand Name | FASEC |
| Certification | ISO 9001; CE; AS/NZS 1397; ASTM A653; MTCs |
| Model Number | Composite Floor Deck |
| Minimum Order Quantity | 1000 MT |
| Price | USD 12-20/SQM |
| Packaging Details | Sea Freight (Container/Bulk Vessel) |
| Delivery Time | 10-30 Days |
| Payment Terms | L/C, D/A, D/P, T/T |
| Supply Ability | 2,000 – 5,000 MT/month |
| Product Type | Long-Span Steel Bridge Deck (ComFlor 210 Equivalent) | Base Material | High-tensile Steel |
|---|---|---|---|
| Surface Coating | Z275 Standard; Z450 / Z600 Optional | Core Function | Permanent Formwork & Tensile Reinforcement |
| Applications | Highway/municipal Bridges, Railway Viaducts, Pedestrian Overpasses, Parking Structures | Customization | Customized To Project Load And Span Requirements |
![]()
Long-Span Steel Bridge Deck | High Load Capacity & Optimized Steel Usage
This long-span steel bridge deck is a high-performance structural floor solution tailored for bridge and infrastructure projects. Adopting G500 high-strength galvanized steel and 210mm deep trapezoidal profile with dual-direction stiffeners, it achieves remarkable spanning performance while greatly reducing steel consumption per square meter. Wider girder spacing cuts secondary steel components, saving materials without sacrificing structural safety and load capacity. Certified to global bridge standards, it is an economical and efficient option for modern bridge engineering.
Core Advantages
1. Large Spanning Range, Greatly Reduced Steel Dosage
Unpropped span up to 6.0m and propped span above 8.5m allow wider girder layout and fewer supporting beams. The deep rib profile boasts strong bending resistance and load distribution capacity. Less steel fabrication, transportation and installation work effectively shortens construction periods and lessens foundation loads.
2. G500 High-Strength Steel for Heavy-Duty Scenarios
Made of G500 structural steel (minimum yield strength 500 N/mm²), it features an excellent strength-weight ratio. It stably withstands heavy vehicle wheel loads, dynamic traffic impact and concentrated equipment loads, maintaining stable performance throughout the whole service life with less steel than traditional decks.
3. Optimized Profile Improves Composite Efficiency
The 210mm trapezoidal rib equipped with transverse & longitudinal stiffeners brings multiple benefits:
- •Powerful bending resistance and uniform load distribution
- •Smooth force transfer between steel deck and concrete slabs
- •Tiny deflection under heavy traffic to guarantee driving comfort
- •Thinner concrete layer available while keeping overall structural strength The integrated steel-concrete composite structure maximizes material utilization efficiency.
4. Obvious Steel Saving Effect
Long-span design widens beam spacing and removes intermediate supports, sharply cutting superstructure steel consumption:
| Layout Mode | Beam Spacing | Steel Consumption | Material Savings |
|---|---|---|---|
| Ordinary bridge deck | 3.0m | High | Benchmark |
| Unpropped long-span deck | ≤6.0m | Much lower | 30%–40% fewer secondary beams |
| Propped long-span deck | >8.5m | Greatly reduced | 50% less primary beams |
| Wide bay overall layout | 12–15m | Optimized | Total steel tonnage down 15%–25% |
5. Efficient Steel-Concrete Composite System
The deck works well with cast-in-place concrete slabs: it acts as permanent formwork during construction and tensile reinforcement after completion. Matching steel bars and anti-crack mesh further strengthen slab rigidity and fire resistance, realizing maximum structural performance with minimal materials.
6. Stable Fire Resistance
It reaches a 2-hour fire rating without bottom fireproof treatment, meeting international bridge safety standards. When combined with beam structures, 60-minute fire resistance is available. No extra fireproof materials are required for most projects, lowering comprehensive costs.
7. Fully Compliant with International Standards
Designed and manufactured in accordance with mainstream global specifications:
- Eurocode 4: Composite steel-concrete structure design
- BS 5950: Steel structure for buildings
- AS/NZS 2327: Composite steel-concrete bridge construction Complete technical manuals and calculation documents are supplied for design review and project approval.
Application Scope
- •Highway & municipal road bridges
- •Railway viaducts
- •Urban pedestrian and bicycle overpasses
- •Heavy-duty vehicle parking structures
- •Factory access bridges for engineering machinery
- •Old bridge renovation and deck replacement projects
Installation Merits
- •Precisely prefabricated panels, fast hoisting and assembly with standard lifting equipment
- •Reduced quantity of supporting beams shortens erection cycle
- •Forms safe temporary working platform instantly after laying, supporting cross construction
- •Nestable profile saves shipping space, convenient for transportation and storage
- •Factory fixed sizes avoid on-site cutting, reduce waste and labor input
Custom Service & Technical Support
- •Custom length, thickness and steel gauge per construction drawings
- •Professional load and span calculation
- •Complete design files, construction guidelines and BIM drawings
- •Open transparent quotation and flexible delivery schedules
- •On-site installation technical guidance on request
Global Logistics & Supply Capacity
Our factory is fitted with high-output roll-forming production lines to satisfy large infrastructure orders. Ample raw material stock ensures fast production start and continuous global supply. Custom protective packaging prevents transit damage; experienced logistics partners guarantee safe and punctual delivery worldwide.
Why Choose Our Long-Span Steel Bridge Deck?
Combining G500 high-strength steel, optimized rib design, large spanning capacity and international standard certification, our bridge deck achieves heavy load bearing with far less steel than traditional products. It cuts material, fabrication and installation costs, and maintains long-term durability under harsh outdoor environments. Strict whole-process quality control and professional technical support fully safeguard project performance.
Manufacturer: Hangzhou FAMOUS Steel Engineering Co., Ltd. (FASECbuildings) Origin: Hangzhou, China
Contact us for your bridge project consultation. Our engineers will offer customized span calculation, design schemes and cost solutions for you.

