-
Structural Steel Fabrication
-
Heavy Steel Fabrication
-
Metal Steel Fabrication
-
Sheet Metal Fabrications
-
High Rise Steel Building Construction
-
Structural Steel Frame Construction
-
Steel Girder Bridge
-
Steel Truss Bridge
-
Pedestrian Overpass Bridge
-
Prefab Steel Frame
-
Light Steel Framing
-
Galvanized Steel Structure
-
Stainless Steel Fabrication
-
Steel Street Light Pole
-
Overhead Sign Structures
-
Steel Arch Bridges
-
Precast Girder Bridge
-
Donald McwayneGood team members always offer budget in time and answer questions with patience, great job! -
Joseph AlexanderI am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
Prefabricated Weathering Steel Truss Bridge – ASTM A588 Corten Park Footbridge
| Place of Origin | China |
|---|---|
| Brand Name | FASEC |
| Certification | ISO 9001; CE (EN 1090); AWS D1.5 Compliant; AASHTO LRFD Compliant; EN 10204 3.1 MTCs |
| Model Number | Steel Truss Bridge |
| Minimum Order Quantity | 100 MT |
| Price | USD 1,000-1,500/MT |
| Packaging Details | Sea Freight (Container/Bulk Vessel) |
| Delivery Time | 30-60 Days |
| Payment Terms | L/C, D/A, D/P, T/T |
| Supply Ability | 5,000-15,000 MT/Year |
| Product Name | Heavy-Duty ASTM A588 Weathering Steel Plate Truss Bridge | Main Material | ASTM A588/A588M Gr.B Weathering Steel |
|---|---|---|---|
| Truss Configuration | Warren, Pratt, Howe, Through Truss, Deck Truss | Connection | ASTM F3125 Gr.A325 Type 3 Weathering Bolts |
| Surface Finish | Bare Weathering Patina / Optional Coating | Quality Control | 100% Factory Trial Assembly, NDT (UT/RT/MT) |
| Applications | Highway Crossings, Heavy Haul & Mining Traffic | Customization | Customized To Customer Requirements |
| NDT Inspection |
|---|
A park footbridge has to satisfy two clients at once: the landscape architect who cares where the structure sits on the path line, and the parks authority who must keep the site open, the trees undamaged, and the maintenance budget flat for decades.
This bridge answers both. It is fabricated as bolted modules from ASTM A588 Corten weathering steel, delivered ready to assemble, and installed without heavy concrete pours or massive plant equipment.
![]()
Site Constraints & Engineering Responses
| Site Challenge | Our Engineering Solution |
|---|---|
| Ground Disturbance | Helical or screw pile foundations replace mass concrete; pad footings available as an alternative. |
| Trees & Root Zones | Modules are sized for hand-carry or light-crane access along existing paths, strictly avoiding canopy and root areas. |
| Park Operations | Installation is typically completed in 2 to 4 days. No site welding means no hot work permits, fire watch, or extended park closures. |
| Irregular Path Alignment | Truss plan geometry is fabricated to the actual curved alignment rather than forcing a straight span. |
| Mixed Users | Width, gradient, and railing detailing accommodate wheelchairs, prams, and cyclists. |
| Vandalism & Night Use | Robust handrail sections, tamper-resistant fixings, and optional integrated lighting. |
Structural System & Deck Options
-
Truss Configuration: Warren or Pratt plate truss with slender members to keep the silhouette light against vegetation. Optional curved chord profiles available.
-
Material: ASTM A588/A588M Gr.B weathering steel (Min. yield 345 MPa). Welded shop fabrication, bolted friction-grip field splices, and match-drilled connections.
-
Deck Options:
-
Timber on steel stringers: Quiet underfoot, cool in summer, and blends naturally with park surfaces.
-
Anti-slip steel plate or open grating: Ideal for wet or heavily shaded crossings.
-
Precast concrete panels: For a hard-wearing, low-maintenance finish.
-
-
Accessibility: Clear walkway width matched to the path hierarchy. Approach ramps coordinated to accessible gradients with flush threshold transitions to avoid trip edges.
![]()
Appearance & Weathering Behavior
-
The Patina Process: Bare Corten develops its patina over 18 to 36 months, moving from mill grey through orange to a stable dark brown.
-
Runoff Management: Drip lines, gravel margins, or temporary collection are planned to manage early patina runoff and prevent staining on light paving.
-
Aesthetics: Low reflectivity and a recessive tone suit wooded and garden settings. Optional factory pre-patination is available to shorten the weathering period.
-
Hardware Protection: Galvanized or stainless fixings are used at hand-contact and splash areas. Isolating washers are used to prevent galvanic action against concrete or timber.
Fabrication, Quality & Installation
-
Fabrication Standards: Welding to AWS D1.5 or EN 1090-2 up to EXC3.
-
Quality Control: 100% Factory trial assembly verifies camber, panel geometry, splice fit, and bolt-hole alignment. Dimensional records, mill certs, and heat-number traceability are supplied.
-
Packaging: Members are match-marked and packed in erection sequence with a QR-coded index.
-
Installation: Lifting plan per module is provided. The structure remains stable at every intermediate erection stage (including overnight), ensuring a safe, bolt-only site assembly.
![]()
Commercial & Delivery
-
Trade Terms: FOB, CIF, CFR, DAP; T/T or L/C at sight.
-
Production Window: Typically 30–45 days after drawing approval.
-
Spares & Maintenance: Spare bolts, bearings, and deck fixings are supplied. Patina surface guidance is included in the O&M manual.
-
Applications: Public parks, botanical gardens, trail and greenway crossings, campus paths, resort grounds, and riverside walkways.
Next Step
Send the crossing location, path alignment, required width, expected users, photographs of both banks, and any landscape constraints. We will return a preliminary 3D model, foundation proposal, and budgetary quotation within 5 working days.
About Us: Hangzhou FAMOUS Steel Engineering Co., Ltd. is a leading structural steel manufacturer based in China, specializing in custom bridges and heavy steel structures.
Contact us at www.famoussteel.com | www.steelfabricat.com for your next project.
![]()

