-
Structural Steel Fabrication
-
Heavy Steel Fabrication
-
Metal Steel Fabrication
-
Sheet Metal Fabrications
-
High Rise Steel Building Construction
-
Structural Steel Frame Construction
-
Steel Girder Bridge
-
Steel Truss Bridge
-
Pedestrian Overpass Bridge
-
Prefab Steel Frame
-
Light Steel Framing
-
Galvanized Steel Structure
-
Stainless Steel Fabrication
-
Steel Street Light Pole
-
Overhead Sign Structures
-
Steel Arch Bridges
-
Precast Girder Bridge
-
Donald McwayneGood team members always offer budget in time and answer questions with patience, great job! -
Joseph AlexanderI am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.
ACRS Certified Circular Steel Pipe Column CHS Tube AS NZS 1163 Welded Bracket Heavy Structure Support
| Place of Origin | China |
|---|---|
| Brand Name | FAMOUS |
| Certification | ACRS Certified; ISO 9001; AS/NZS 1554 Compliant Welding; MTCs |
| Model Number | ACRS Certified CHS Steel Pipe Column |
| Minimum Order Quantity | 100 MT |
| Price | USD 1,000-1,500/MT |
| Packaging Details | Sea Freight (Container/Bulk Vessel) |
| Delivery Time | 10-30 Days |
| Payment Terms | L/C, D/A, D/P, T/T |
| Supply Ability | 2,000 – 5,000 MT/month |
| Product Name | ACRS Certified CHS Steel Pipe Column | Main Material | AS/NZS 1163 CHS Tube (C350 / C450) |
|---|---|---|---|
| Design Standard | AS 4100 (Structural Steel Design) | Surface Treatment | AS/NZS 4680 Hot-Dip Galvanized |
| Welded Accessories | Base Plates, Flange Brackets, Gussets (Factory-welded) | Connection Method | Bolted To Foundation / Beams |
| Applications | Canopies, Car Parks, Pipe Racks, Heavy Structure Supports | Customization | Customized To Customer Requirements |
This circular steel pipe column is a CHS tube column fabricated to AS/NZS 1163 and designed to AS 4100. It is supplied with ACRS certified steel and hot-dip galvanized to AS/NZS 4680 where site conditions demand it.
In Australian or New Zealand projects, a round pipe column is rarely a plain tube: it arrives with a welded base plate, flange bracket, gusset set, or crane bracket already attached, drilled to the anchor plan, and marked for erection.
The welded flange bracket and base plate are designed as part of the same AS 4100 calculation—not added afterwards. This ensures the weld size, stiffener layout, and bolt group are entirely consistent with the load path. Because a circular section has no weak axis and sheds water well, it is often preferred over H-section columns for exposed canopies, open car parks, shade structures, and architectural columns.
![]()
Key Features
-
AS/NZS 1163 CHS Tube: Supplied in C350 or C450 grade with mill certificates showing heat number, chemistry, and tensile results.
-
ACRS Certified Steel: Gives the buyer a fully traceable material chain, ensuring smooth approval submissions.
-
AS 4100 Structural Design: Column capacity, second-order effects, connection design, and base plate bending are calculated and issued as a signed design package.
-
Welded Brackets & Base Plates: Welded with qualified procedures, drilled to the anchor plan, and checked against the design report.
-
AS/NZS 4680 Galvanizing: Applied after fabrication with coating thickness checks. Vent and drain holes are detailed to protect the inside of the tube.
-
Dimensional Control: Tube straightness, ovality, flange squareness, and hole positions are inspected before coating, ensuring the column lands on anchor bolts without site reaming.
-
Container-Friendly Detailing: Long columns are split at agreed splice points with matching splice plates and bolts for easy container shipping.
![]()
Technical Specifications
(Note: Diameter, wall thickness, bracket projection, and bolt group are calculated per project and frozen in the approved shop drawing revision, not by catalogue size.)
| Item | Specification |
|---|---|
| Tube Type | CHS circular hollow section, round steel pipe column |
| Tube Standard | AS/NZS 1163 (cold or hot-formed hollow section) |
| Steel Grade | C350 or C450 (selected by AS 4100 calculation) |
| Material Certification | ACRS certified steel with mill certificates and heat traceability |
| Design Standard | AS 4100 (connection and base plate design included) |
| Welded Components | Base plate, flange bracket, gusset, stiffener, crane bracket |
| Welding Quality | Qualified WPS, visual inspection + NDT on nominated full-penetration welds |
| Galvanizing | AS/NZS 4680 hot-dip galvanizing with coating thickness check (or painted on request) |
| Anchor Interface | Base plate drilled to anchor plan; template and anchor bolt set supplied |
| Surface Finish | Galvanized only, galvanized + topcoat, or primer + topcoat for architectural columns |
| Splice Detail | Bolted splice (end plate or sleeve) for limited shipping lengths |
| Inspection Records | Mill certificates, weld inspection, dimensional audit, coating report, packing list |
Standards Map (Why All Four Matter)
Four documents control this product, and buyers should ask for all of them:
-
AS/NZS 1163: Confirms the round pipe is the correct size, wall thickness, and grade.
-
ACRS Certification: Proves the steel source is audited and traceable (critical for certifying engineers).
-
AS 4100: Verifies the column, welded brackets, and base plates can carry the load under specified restraints.
-
AS/NZS 4680: Confirms the galvanized coating meets thickness and adhesion requirements for inland, coastal, or marine exposure.
![]()
Fabrication & Welding Quality
Round tube columns fail at connections far more often than in the shaft. Therefore, fabrication focuses heavily on the welded bracket and base plate:
-
Tube ends are cut square and profiled for full-penetration welds.
-
Flange/base plates are tacked on a jig to maintain squareness to the tube axis.
-
Welding follows qualified procedures with preheat applied for thicker walls. Nominated full-penetration welds undergo UT or MT.
-
After welding, the column is checked for straightness, bolt holes are verified against the anchor template, and trial fitting is performed where the anchor pattern is critical.
-
Vent and drain holes are added prior to galvanizing to ensure molten zinc reaches the inside of the CHS tube.
Customization Scope
-
Structural: Tube diameter, wall thickness, C350/C450 grade, column length, splice point, base plate size, bolt group, bracket orientation, gusset layout, crane/canopy brackets.
-
Coating: Galvanized only, galvanized + topcoat, or full paint system (color matched to project palette).
-
Documentation: Drawing language, units, calculation report format, NDT scope, third-party inspection, and certificate packages.
(If you own a design, we fabricate from your drawing and return a fabrication review noting any weld access, coating drainage, or bolt clash issues before cutting.)
![]()
Applications
-
Canopy and awning columns
-
Open car park structures & shade supports
-
Conveyor and pipe rack columns
-
Signage and lighting masts
-
Mezzanine support columns & stadium framing
-
Architectural exposed columns (where slim profiles matter)
Common Questions
Q: Is ACRS certification the same as AS/NZS 1163 compliance?
A: No. AS/NZS 1163 is the product standard for the hollow section, while ACRS certifies the steel source and traceability. A compliant tube can exist without ACRS; buyers needing ACRS must request it at the quotation stage.
Q: Can the column be supplied galvanized and painted?
A: Yes. The duplex route (galvanize first, then apply a compatible primer/topcoat) is common for exposed architectural columns. It adds cost and lead time, so it should be stated at enquiry.
Q: How is a long CHS column shipped in a container?
A: The column is split at an agreed splice point (usually end plate or sleeve connection), designed to AS 4100. Matching splice plates and bolts travel with the shipment.
Q: What should be confirmed before the shop drawing is frozen?
A: Anchor bolt pattern, base plate level/grout thickness, bracket orientation/beam interface, coating system/color, splice position, and NDT scope.
Documentation & Approval Package
Each order is supplied with:
-
General arrangement drawings.
-
AS 4100 design report (covering the tube, bracket, and base plate).
-
Mill certificates (heat numbers linked to ACRS certification).
-
WPS, welder qualifications, and NDT reports.
-
Galvanizing coating records and a dimensional inspection sheet.
-
Packing list keyed to member marks.
Packing & Delivery
-
Columns are bundled by erection zone with timber/rubber spacers to protect the galvanized surface.
-
Base plates and brackets are edge-wrapped; bolts and splice sets are packed in labelled crates.
-
Long columns are split at agreed splice points with matching splice plates.
-
A container loading plan and a pre-shipment photo report are issued before dispatch.
About Us
Hangzhou FAMOUS Steel Engineering Co., Ltd. is an integrated structural steel manufacturer and global exporter, specializing in custom-engineered steel buildings, bridges, and heavy structures. We deliver true end-to-end solutions—covering structural design, detailing, precision fabrication, surface treatment, and worldwide logistics.
With a deep commitment to international quality standards including AISC, CE EN 1090, AS/NZS, and ISO 9001, our in-house engineering team ensures every project is built to exact tolerances and long-term reliability.
Ready to build a structure that outlasts its environment?
Send us your project drawings, site conditions, or specific requirements today. Our dedicated engineering team will provide a tailored design proposal and a competitive quotation. Let's build something exceptional together.
🌐 Explore our capabilities: www.famoussteel.com | www.steelfabricat.com
📩 Contact us now for a free technical consultation.
![]()

