Unpropping Metal Floor Deck System – ComFlor 210 Alternative (Fast Installation)

Place of Origin China
Brand Name FASEC
Certification ISO 9001; CE; AS/NZS 1397; ASTM A653; MTCs
Model Number Composite Floor Deck
Minimum Order Quantity 1000 MT
Price USD 15-20/SQM
Packaging Details Sea Freight (Container/Bulk Vessel)
Delivery Time 10-30 Days
Payment Terms L/C, D/A, D/P, T/T
Supply Ability 2,000 – 5,000 MT/month
Product Details
Product Name Unpropping Metal Floor Deck System (ComFlor 210 Alternative) Base Material Zinc-Coated High-Tensile Steel Strip
Surface Coating Z275 Standard; Z450 / Z600 Optional Core Function Permanent Formwork For Unpropped Composite Concrete Slabs
Applications Multi-storey Steel Frames, Warehouses, Mezzanines, Fast-track Projects Customization Customized To Project Load And Span Requirements
Leave a Message
Product Description

This metal floor deck system is a propping-free alternative to the ComFlor 210 deck. The sheet is roll-formed from zinc-coated high-tensile strip with a 210 mm rib and cut to the exact bay length, allowing it to be lifted and laid directly onto the beams.

The Power of Unpropping:
Unpropping means the deep-rib deck independently carries the wet concrete and construction loads between beams without temporary props underneath. This removes the prop inventory, eliminates double-handling between floors, and eliminates the safety risks of working at height to strike props. The floor below also remains completely clear while the slab above is poured.

(Note: Unpropping is not automatic for every layout. Where span, slab depth, or pour sequence sits outside the span table, the same sheet is used with props. The span table issued with the quotation states which bays can be poured without props).

Unpropping Metal Floor Deck System – ComFlor 210 Alternative (Fast Installation)

Complete System Components

We supply this as a complete system package, not loose sheets. All components are specified against the same layout drawing, ensuring your installation crew is never chasing missing parts on the day of the pour:

  • Deck Sheet: Permanent formwork and tensile reinforcement (roll-formed, cut to bay length, strapped in bundles).

  • End Closures: Pressed steel, matched to the profile to stop concrete leaking at bearings.

  • Side Lap Screws: Self-drilling screws (centers set by the span table) to fix sheet to sheet.

  • Shear Studs: Welded through the deck to transfer horizontal shear between the steel beam and concrete slab.

  • Edge Trim & Pour Stops: Galvanized angle/channel to form the slab edge; folded strip to hold concrete at joints.

  • Lifting Clutch: Supplied or hired on request to lift bundles without deforming the sheets.

​Unpropping Metal Floor Deck System – ComFlor 210 Alternative (Fast Installation)

Fast Installation Workflow

Because the sheets are pre-cut and accessories arrive in the same shipment, site operations are reduced to laying, screwing, and fixing:

  1. Plan: Layout drawing is checked, and bundles are planned per floor to land where they will be laid.

  2. Lift & Place: Lift with a clutch and place on beams in the pour sequence (never stack on unsupported sheets).

  3. Lay Sheets: Work rib-down across the beams, moving away from the lifting point.

  4. Screw Laps: Screw side laps immediately to turn single sheets into a secure working platform.

  5. Fit Trims: Fit end closures at bearings and fix edge trim along the perimeter.

  6. Weld Studs: Weld shear studs through the deck (earth the deck for the welding set).

  7. Prep: Install reinforcement, services, and temporary edge protection.

  8. Pour: Pour concrete in the agreed sequence, checking for local damage.

Technical Data

 
 
Item Specification
Profile Type Metal floor deck system, ComFlor 210 alternative envelope
Rib Height & Cover Width 210 mm / 600 mm
Base Metal Thickness 0.9 mm to 1.5 mm (Selected per floor design)
Sheet Length Cut to bay length, up to 12 m
Steel Grade S280GD to S350GD, G500 on request
Zinc Coating Z100 to Z275 (Selected for site exposure)
Design Standard AS1397, EN 10346
Unpropped Span Set by the manufacturer span table (thickness, slab depth & pour sequence)
Concrete Normal weight concrete, slab depth set by structural design

ComFlor 210 Compatibility

This system is dimensionally identical to the ComFlor 210 profile. The 210 mm rib, 600 mm cover width, and site fixing sequence (side lap screws, end closures, shear studs) align perfectly with your existing deck zone design. Please note: Span tables are not interchangeable, and the structural engineer must confirm the final slab design and load table for each specific project.

Customization Options

  • Length: Cut to the exact bay length to minimize site cutting waste.

  • Gauge: Base metal thickness selected per floor loading (heavier gauges only where needed).

  • Materials: Steel grade and zinc coating (Z100-Z275) tailored to the project's exposure time.

  • Logistics: Bundle marks and delivery sequences set to the exact floor and grid reference for direct crane lifting.

Typical Applications

  • Multi-storey steel frame floors built on a fast, repetitive cycle.

  • Warehouse and distribution floors where access below must stay open during the pour.

  • Mezzanine and plant platforms inside operating buildings.

  • Projects where prop hire and prop labor are significant cost lines.

Information Needed For A Quotation

Send us the following to receive a full package quote (including a propped vs. unpropped comparison):

  1. Beam grid drawing with deck bearing lines and the intended pour sequence.

  2. Required sheet thickness, slab depth, and design imposed load.

  3. Required zinc coating class, steel grade, and any project standard.

  4. Accessories scope (end closures, edge trim, pour stops, etc.).

  5. Delivery port and required date per floor.